https://www.youtube.com/watch?v=JJcbRjqlfic&t=4s&index=6&list=WL
影片中可以看到肯尼亚广袤的草原、兴建中很高的桥墩、挖很宽的地基、R21站、DK31站
DK52站、DK74站、DK99站、铺架基地 景色很漂亮
维基上关于此线路的介绍:
Nairobi–Naivasha Section
This section was also contracted to the company that constructed the Mombasa–
Nairobi Section. The line stretches from Nairobi to Naivasha, a distance of
about 120 kilometres (75 mi), at cost of KSh150 billion (US$1.5 billion),
borrowed from the China Export-Import Bank. Construction began in 2018 and is
expected to conclude in December 2019.