来源 DigiTimes
https://tinyurl.com/yyodwt32
原始出处 The Guru3D.com
https://tinyurl.com/y2fwfdha
One thing is clear, Samsung can't produce the Ampere-based GPUs quick enough
or in enough volume so, from the looks of things, NVIDIA will be moving a
large chunk of wafer fabrication to TSMC.
很明显的,三星无论是速度还是制造量上都不足以供给安培架构GPU。目前来看,NVIDIA
将会把一大部分晶圆制造转移给台积电生产。
The news reached the web today though DigiTimes. And if true that means that
NVIDIA likely will slip towards 7nm wafer die production, as expected for a
long time in the first place. What also is possible it that the 'update'
product like an RTX 3080 with 20GB or other products like the RTX 3050/3060
in the lineup that has not been released just yet move to that TSMC 7nm node.
Digitimes今天传出的这个消息如果属实,那意味着NVIDIA可能会像当初预期的转为以台
积电7nm制程生产。甚至有可能让尚未发布的加强型号(EX: RTX 3080_20GB)或是尚未发
布的新产品(EX:RTX 3050/RTX 3060)转为台积电7奈米制程。
DigiTimes states Nvidia has already booked high volume production capacity on
TSMC’s 7 nm nodes for 2021. TSMC recently lowered the prices on the 7nm
wafers and also mentions the choice is made to spread risk that is yield
related.
据DigiTimes所说,NVIDIA已在台积电7奈米制程上预订了大量产能。台积电近期调降了7
奈米晶圆的价格,并说这样是为了分散与产量相关的风险。