有人说为啥这么贵
这东西好像就产学合作出来的
在其他地方整个做好再搬过去一起装起来
号称可以减少施工期间的交通阻碍,也可以降低危险性(?)
他们学校之前发的新闻
https://tinyurl.com/y9ct5bwl
节录一些
The 174-foot, 950-ton section of the bridge was built adjacent to Southwest
Eight Street using Accelerated Bridge Construction (ABC) methods, which are
being advanced at FIU’s Accelerated Bridge Construction University
Transportation Center (ABC-UTC). This method of construction reduces
potential risks to workers, commuters and pedestrians and minimizes traffic
interruptions. The main span of the FIU-Sweetwater UniversityCity Bridge was
installed in a few hours with limited disruption to traffic over this weekend.
这种工法其实他们也不是第一个发明的
这边谈到这座天桥是用他们大学改进出来的桥梁加速建造工法
The FIU-Sweetwater UniversityCity Bridge is the largest pedestrian bridge
moved via Self-Propelled Modular Transportation in U.S. history.
号称目前是美国最大型的预建后移动组装的天桥
作者: WestRiver0tp (pin-ger)   2018-03-16 04:50:00
美国盘子真多
作者: gk1329   2018-03-16 04:51:00
真-全民公测 GG了
作者: wjes30325 (台湾的小朋友很棒)   2018-03-16 04:53:00
公司不知道会赔多少 在台湾大概就换个名字继续惹
作者: gk1329   2018-03-16 04:53:00
能做到放上去不会垮 过一阵子才会垮的半稳定陷井也是很神
作者: yayaya9487 (yayaya)   2018-03-16 04:55:00
作者: Nyeduxa (Noelace = Noel+Anelace!)   2018-03-16 05:09:00
其它同类计划要GG惹
作者: kevin05233 (kk)   2018-03-16 05:16:00
就乐高概念啊......
作者: hdjj (hdjj)   2018-03-16 05:43:00
预建工法本身没有问题,有问题的是这家公司,到底有没有计算过材料应力,就不要到最后说什么计算时少了一个零之类的..
作者: ghchen1978 (什么都不是)   2018-03-16 05:45:00
这做法没啥阿,飞机火箭也都是这样拼起来的
作者: ksjr (kjsr)   2018-03-16 05:57:00
新闻下面留言有说钢缆还没架上去 但是还是等报告吧
作者: albert7387 (我的车好帅~)   2018-03-16 06:52:00
看图觉得PT要放在span下方,而不是上方
作者: RedCarRet (阴骘小人)   2018-03-16 07:13:00
学生作业 囧
作者: jack1218 (赤城我老婆)   2018-03-16 07:31:00
真的是学生作业
作者: rainxo6p (雷恩)   2018-03-16 07:32:00
预铸工法很常见啊 不然你不会看到捷运梁掉下来的新闻